• Skip to navigation
  • Skip to content
 
  • Home
  • About Us
    • About Us
    • Our Mission
    • Company Profile
    • President’s Message
    • Policies
    • Code of Ethics
    • Our Commitment
      • Quality
      • Safety
    • Employee Login
      • Office 365 Login
      • Yammer
      • Business Portal Login
      • Remote Desktop Login
  • Our Team
    • Work Organization
  • Projects
    • All Projects
    • Ongoing Projects
    • Completed Projects
  • News
    • Events
    • News
  • Capabilities
    • Sustainable Construction
    • Experienced Workforce
    • Construction Equipment
  • Technology
    • Building Information Modeling (BIM)
    • Estimating Systems
    • Mobility and Connectivity
    • Project Management System
    • Project Document Controls (PDC)
    • Enterprise Resource Planning
  • Certificates & Awards
  • Careers
    • Jobs Listing
    • Apply Online
  • Contacts
  • Videos
HBK Contracting Co. W.L.L.
Phone, name of company etc., for printing

Roads and Infrastructure in Bani Hajer North Phase 1 and 2 Package 02

Roads and Infrastructure in Bani Hajer North Phase 1 & 2, Package 02

The DN001 Bani Hajer North, Phase 1 & 2, Package 02 scheme is located  in the Al Rayyan Municipality, approximately 10km to the West of Central Doha and within the Qatar Area Referencing System (QARS) Zone 51. The site boundary is defined to the East by the Gharrafat Al Rayyan Street (Al Nassria Link Road) and further to the South by Al Terhab Street. This project has been split into Phase 1 & 2 which is separated by land allocated to Qatar Foundation for Education City. Phase 1 lies in the South Central position of the District of Rawdat Egdaim and its Southern boundary runs adjacent to Al Terhab Street and the District of Al Seej. Phase 2 lies in the Central Western position of the District of Al Gharrafat and Al Rayyan. The site boundary is defined to the East by the Gharrafat Al Rayyan Street (Al Nassria Link Road) and further to the South by Al Terhab Street. The approximate lengths of the roads & Utilities according to relevant packages are as follows:

•For package 1 Phase-1 & 2 the approximate length is 4,545 metre for 64 m corridor and Pipe length of 10,035 and micro-tunneling length of 735m.

•For package 2 the approximate length is 3,039 m for 40m corridor, for 20m corridor approximate length of 979 m, and 32m corridor approximate length of 905 m. however 2 nos. Water Tank to be construct and Pipe length of 54,189 and micro-tunnelling length of 5,574m.

 

Previous Next

Project Location
Search

Contact Us

Hamad Bin Khalid Contracting Company.
P.O.Box 1362, Doha - Qatar
Phone: (+974) 4445 1111
Telefax: (+974) 44451000
Email:info@hbkcontracting.com

Follow Us

Stay Updated

Sign up for our newsletter. We won't share your email address.

Recent Images

  • Katara-Towers
  • NPP/0032 Commercial Terminals, Infrastructure and Buildings
  • CP6

Locate Us

  • © 2016 – 2022 HBK CONTRACTING. All rights reserved. ISO 9001 ISO 14001 ISO 18001 ISOTS 29001 USGB