The Green Line contract comprises the design and construction of the underground works below central Doha and to the West of the city, between the proposed Msheireb Underground Station and through to Al Rayyan Stadium.
There will be eight underground stations, in addition to a 16.6 km twin bored tunnel. The rail tunnels will be built at an average depth of 20 m below ground.